
Rear additions
A bigger kitchen, family room or main-floor bedroom off the back of the house.
Rear additions, second storeys and rooms over the garage, with the drawings and the Town of Milton permit handled for you.
Rough budgets before HST. The real number comes after a site visit and drawings. Additions under about 400 sq ft cost more per square foot, and underpinning is priced separately. See the full cost guide.

Going up keeps your yard and can double the bedrooms on the same lot. Before anything is drawn, an engineer checks that the foundation and walls can carry the new floor.
Second storeys fall in the same rough budget as other additions, $300 to $500 per sq ft before HST.
Read the second-storey guideYes. Every addition needs a building permit from the Town of Milton, and residential permits go in through the Town's online services portal. Read the full permit guide.
Any addition, a second storey, a finished basement, a secondary suite or a new window or door opening.
Setbacks, lot coverage and the driveway, plus existing and new grades and where the water drains.
Online through the Town's portal. Drawings go in as PDFs from the design software, not scans.
A completeness check first, then the full review once fees are paid. 10 business days for a complete house application.
Lots in a conservation authority's regulated area need its approval. North Milton can also need the Niagara Escarpment Commission.
On septic, an addition that grows the floor area by more than 15%, adds a bedroom or adds fixtures needs a septic evaluation.
Rear, side and second-storey additions across the Town of Milton.
Older homes around Main Street, often on deeper lots.
Established neighbourhood in central Milton.
Newer subdivision homes in east Milton.
Rural hamlet in north Milton, near the Niagara Escarpment.
Yes. The Town of Milton lists additions as permit work, and applications go in through its online services portal. Building without a permit can bring fines under the Building Code Act.
As a rough budget, $300 to $500 per sq ft before HST. Design and permits are priced separately and quoted after the site visit.
Plan on 2 to 6 months for design and permits, then 5 to 9 months to build, depending on the size, inspections and any changes along the way.
The Town first checks the application is complete, then starts the full review once the permit fee is paid. The Building Code gives 10 business days for a complete house application.
Often, yes, if the foundation and walls can carry it and the zoning allows the height. An engineer checks the structure before anything is drawn.
Only if the addition doesn't meet the zoning by-law, for example on setbacks, height or lot coverage. That goes to the Committee of Adjustment before the building permit.
Lots near creeks, valleys and wetlands can be. If yours is, Conservation Halton's approval comes before the building permit.
A site visit shows what your lot allows and what an addition would involve.